Skip to main content

© Industry Queensland. All rights reserved.

Designed by: Getmilk

Big One copper shows as drilling continues

Drilling at the Big One deposit has yielded visible copper mineralisation up to 34m thick, Castillo Copper says.

All seven drill-holes completed in the campaign so far, through visual inspection, appeared to have intersected copper mineralisation, the company said.

“Hitting copper mineralisation seven times from seven starts is an outstanding way to progress the drilling campaign at the Big One deposit,” Castillo Copper managing director Simon Paull said.

“Moreover, the result from drill-hole 318RC is excellent, throwing off two zones of visible mineralisation totalling 45m and confirms massive copper sulphides are apparent.

“In addition, the Board is delighted there is clear evidence that known copper mineralisation has been extended and looks forward to releasing interpreted insights from upcoming assays results.”

The drilling campaign is continuing at Big One deposit, with a further 19 drill-holes to complete.

Castillo is finalising logistics, access, cultural heritage, and targets for a planned drilling campaign at the nearby Arya
prospect.

Arya and Big One lie within Castillo’s Mount Oxide project, located 150km north of Mount Isa near the old Mount Oxide copper mine.

Big One deposit - Mount Oxide project map
Big One deposit – Mount Oxide project map

Share Post:

Share Post:

3
You have FREE views remaining
×