
Twin Hills drilling delivers for GBM Resources
GBM Resources says its Twin Hills acquisition is delivering better-than-expected grades in drilling, with outstanding results including an intercept of 162 m at 2.65 g/t gold.
Twin Hills includes the 309 and Lone Sister deposits and more than 1102sq km of mining and exploration tenements.
The site was previously mined by BMA , which established an underground mine at the 309 deposit and completed a decline to about 160m.
It is a cornerstone asset in GBM’s plans to build a gold portfolio of more than two million ounces within the Mount Coolon region – providing an entry to develop into a mid-tier Australian gold company.
“Excellent assay results from GBM’s first two drill holes at Twin Hills demonstrate the quality of the 309 resource,” GBM managing director and chief executive officer Peter Rohner said.
“The recent acquisition of the Twin Hills project was transformational for GBM. It is very pleasing to see better than anticipated grades and together with the recent Twin Hills resource upgrade, GBM is continuing to move toward becoming a genuine mid-tier Australian gold company.”
Results have come back from the first two drill holes in a planned 17-hole program at the 309 deposit. They include the intercept of 162 m at 2.65 g/t gold, which includes 16 m at 13.49 g/t gold.
GBM says the results have confirmed a large near-surface, bulk mineable style gold deposit at 309 and higher gold grades than predicted from the current resource estimate, which has the potential to greatly increase the grade of the resource in this area.
At the time of GBM’s acquisition of the asset from Minjar Gold, Twin Hills contained a JORC 2012
mineral resource estimate for the 309 and Lone Sister deposits of 6.9 Mt at 2.8 g/t gold for
633,000 oz gold.
The company has recently announced a resource upgrade for the 309 deposit that now totals
12.9 Mt at 1.8 g/t gold for 760,700 oz.













