
Pontoon rig brings more success at Mount Chalmers
QMines has reported further high-grade results from an ongoing drilling program targeting copper and gold beneath the flooded Mount Chalmers open pit.
Drillhole 26MCDD043 returned 26.2m at 1.3 per cent copper and 0.7g/t gold (2.0 per cent CuEq), including 2.4m at 5.4 per cent copper and 3.8g/t gold (9.1 per cent CuEq) in semi-massive sulphide, the company said.
Further high-grade copper-gold mineralisation was intersected 64m east in hole 26MCDD047, while hole 26MCDD048 returned 13.0m at 1.0 per cent copper before being abandoned in copper-zinc mineralisation.
The drilling in the old open pit area is undertaken using a UDS Hanjin DB8 rig mounted on a pontoon, with HQ3 and NQ diamond core recovered beneath the pit lake.
Since late July 2026, 14 pontoon holes have been drilled for 1281m.
Related: Mount Chalmers pit floor delivers high-grade results
QMines (ASX: QML) exploration manager Tom Bartschi said the results from drillhole 26MCDD043 were particularly encouraging, with 26.2 metres of copper-gold mineralisation.
“What is equally important is the geology,” he said.
“We have intersected high-grade semi-massive sulphide sitting above a substantial copper-bearing stringer zone, consistent with what we expect from the Mount Chalmers VHMS system.
“With further high-grade copper and gold intersected to the east, and another hole finishing in copper-zinc mineralisation, we are continuing to build our understanding of what sits beneath the historic pit.
“These results will feed directly into our mineral resource update, with an emphasis on a mining-ready estimate, while the fresh core is also supporting ongoing metallurgical testwork.”
The pontoon-based rig is one of three at work at Mount Chalmers, about 20km north-east of Rockhampton in Central Queensland.












