Skip to main content

© Industry Queensland. All rights reserved.

Designed by: Getmilk

Mount Chalmers pit floor delivers high-grade results

QMines has released the first assay results from its in-pit pontoon diamond drilling program at the Mount Chalmers copper-gold project near Rockhampton.

The ground beneath the floor of the old Mount Chalmers pit has sat under water since mining ended, and the 2024 mineral resource block model had to rely mainly on historical drilling.

Holes 26MCDD025 and 26MCDD027 are the first direct test of the model with modern core, and both have come back with higher grades than modelled.

26MCDD025 intersected high-grade mineralisation in the first metre and 6.7m at 2.07 per cent copper, 2.37g/t gold and 60g/t silver from 23.3m downhole, including 2.7m at 1.29 per cent copper, 4.44g/t gold, 109g/t silver, 5.25 per cent zinc and 3.04 per cent lead from 23.3m; and 3.0m at 3.15 per cent copper, 1.15g/t gold and 31g/t silver from 27.0m; within 16.7m at 1.04 per cent copper, 1.16g/t gold and 26g/t silver from 23.3m downhole.

26MCDD027 intersected 8.3m at 1.64 per cent copper and 0.51g/t gold, including 3.3m at 2.70 per cent copper, 0.59g/t gold and 16g/t silver from 42.7m, within 11.3m at 1.32 per cent copper, 0.43g/t gold and 11g/t silver from 42.7m downhole.

“These holes are providing fresh core directly beneath the pit for future resource modelling and further geometallurgical testwork,” QMines exploration manager Tom Bartschi said.

“We now have a further seven completed pontoon holes at the laboratory, which are expected to show us the continuity and geometry of this mineralisation beneath the pit floor modern drilling.”

With assays pending for a further 37 holes totalling, and a third rig now drilling, QMines has a substantial pipeline of results expected over the coming weeks.

Share Post:

Share Post:

3
You have FREE views remaining
×